Architecture

IL I57 Trail of Tears Rest Area

Completed
2025

IL I57 Trail of Tears Rest Area

New Construction

The project consisted of the demolition and construction of two different rest area buildings at the Trail of Tears Northbound site and Trail of Tears Southbound site. The design of the building and the exterior landscaping reflect the significance of the site locations and proximity to the Trail of Tears. Each building is approximately 6000 sq. ft., and consist of two gang restrooms, a security office, vending storage, breakroom area, building services storage and
interpretive center. New sidewalks, ramps, picnic areas, outdoor play and exercise equipment are all included in the design. Reconstruction of the existing sewage lagoon is also included in the project.

– IDOT requested that we incorporate a design that could be used as a template for future rest areas, which we successfully accomplished.
– We evaluated the sewers lagoon and gave the user three options with cost estimates.
– Designed a completely new facility that will be the first new rest area built in Illinois in many years.

Year Completed 2025

Construction Cost  $15,306,510

Back to Projects